Detailed Engineering for Suban 12 Flowlines Installation Project

    Project Description:

    ConocoPhillips Indonesia has intension to expand their plant at Suban, South Sumatra. Therefore, Suban 12 project was initiated.

    Suban 12 Project held to accomodate the expansion performed in Suban well and station. There also a modification on pipeline that connecting Suban well and station.

    Plant Description

    The Suban-12 flow line is located in Corridor Block, Musi Banyuasin Regency, South Sumatra Province. The project will gather raw gas from gas well and be tied-in onto exciting inlet Suban Gas Plant. The construction will be at the existing pipeline Right Of Way (ROW) and 10 meter extended to minimize the project footprint.

    The project scope includes the well site facilities, under ground flow line and tie-in onto existing inlet header.  Suban-12 well surface location is shown below.

    The Work Site includes the following:

    Suban Gas Plant

    Suban-12 Well site within 3.5 km radius from the Suban Gas plant.

    plant separated into 2 location, well site and station area. Well site area facility including

    Wellhead control panel (pneumatic system)

    Vent system

    Chemical injection system

    Instrument gas system

    launcher

    Stasion area facility including :

    Inlet header train

    Closed drain system

    Gathering flowline

    Inlet cooling & separation system, consist of:

    launcher,

    cooler,

    separator

    Scope of Services 

    BiRU was responsible to generate engineering deliverables involving civil, piping and pipeline disciplines. Analysis was performed due to equipment additional, such as pig launcher, shelter, lightening pole and lighting tower. BiRU also responsible to perform flowline modification to handle oil and gas production. BiRU also challange and successed to design appropriate flowline with special condition that soil was heated by heat radiation occured from existing flowline.

    • Client

      Conoco Philips
    • Project Year

      2012
    • Project Location

      Suban Field, South Sumatra
    • Completion Date

      31.12.2012