Client
PT.PAL Indonesia
Project Year
2012
Project Location
Ketapang PSC
Completion Date
31.12.2012
DED Bukit Tua Jacket & PMT for BTJT-A Platform, Bukit Tua Platform Development Project
Project Description
Petronas Carigali Ketapang II LTD (PCK2L) plans to develop the Bukit Tua Field, located in app. 110 km northeast of Gresik, East Java.
BTJT-A platform is a tripod platform with 2 batter legs and 1 straight leg. It has 4 level deck. The main deck is the top deck that supports a 20 metric ton deck crane and a vent boom.
Platform Description
ü3 legs Jacket Wellhead platform with multi level deck
üNumber of Deck = 4
Main Deck El. (+) 77,10’
Mezzanine Deck El. (+) 62.34
Cellar Deck El. (+) 49.21’
Sub Cellar Deck El. (+) 32.80’
üPlatform Weight
Jacket Weight = 4237.28 kips
Deck Weight = 3039.99 kips
Wellheads :
No. of well slots : 9
Conductor size : 24”
üTopside Facility
WHP to FPSO Liquid Pipeline Pig Launcher
WHP Gas Pipeline Pig Launcher
WHP to ORF Gas Export Pig Launcher
FPSO to WHP Gas Export Pig Receiver
Test & Production Separator Package
Close & Open Drain System
CO2 Snuffing Package
üTopside Facility
Diesel storage system
Micro turbine Generator
Emergency Diesel Generator
Potable / Wash Water Tank
Pedestal Crane
HVAC Package
Scope of Services
BiRU responsible to perform analysis for structure discipline. It cover pre-service and in-service condition, such as lifting, transportation & seafastening, in-place, seismic and fatigue spectral analysis.
BiRU provide Project Management Team to accomodate project requirement. This team make a direct communication with client during the engineering and construction phase.
BiRU involve on construction phase, trough PT BiRU Construction. PT BiRU Construction provide all manpower, equipment and required material for platform construction. The platform was constructed in Surabaya, Indonesia.