Our Projects

Client
Bakrie Construction

Project Year
2012

Project Location
West Madura Block

Completion Date
31.12.2012

Onshore Fabrication And Construction Services for KE-39, KE-54, And KE-38B Platforms

Project Description

Pertamina Hulu Energi West Madura Offshore (PHE WMO), as operator of West Madura Offshore Field, plans to develop this field further. Therefore, 3 well head platform will be built, named as KE39, KE38B and KE54. All of these platforms will be placed in an adjacent area, with their own location characteristic.

KE39, KE38B and KE54 is a braced monopod platform. All of them are an identical platform. It has 4 level deck, with two boat landing. These platform will be installed in the largest reservoir in West Madura Block. After its installed and operated, KE38B production reach the highest production number among all PHE WMO’s platform

Platform Description

üBraced Monopod Jacket Wellhead platform

üNumber of Deck  = 4

Main Deck     El. (+) 59’-6”

Mezzanine Deck    El. (+) 46’-6”

Cellar  Deck    El. (+) 35’-6”

Sub Cellar  Deck  El. (+) 20’-0”

üPlatform Weight

Jacket Weight  = 699.88 kips

Pile Weight   = 554.04 kips

Deck Weight   = 652.67 kips

Platform Description

12 x Well slots (6 well slot for initial production and 6 well slot for future development

üTopside Facility

Pedestal Crane

Diesel Generator set

Navigation Aid

Pig Launcher

Wellheads

WHCP Pneumatic – Hydraulic System

Chemical Injection Package

Instrument Utylity Gas System

Platform Description

üTopside Facility

AC / DC Distribution Board

RTU – SCADA

Radio Link / Antena

Close & Open Drain System

Horizontal Tes Separator Package (Three Pase Separator

Scope of Services 

BiRU provides engineering service for the construction of 3 platform. This engineering phase will involve several discipline, such as Process, Process Safety, Piping, Mechanical, Electrical, Instrumentation and Structural. All analysis was performed simultaniously. Team structure also was challange to perform analysis with for each platform condition. Beside that, BiRU was requested to perform pre-service analysis such as upending and seafastening analysis.

During fabrication phase, BiRU’s responsibility is to provide field adjustment assessment and to produce as-built drawing. BiRU also provide procurement service during engineering ang fabrication phase.