Client
Bakrie Construction
Project Year
2012
Project Location
West Madura Block
Completion Date
31.12.2012
Onshore Fabrication And Construction Services for KE-39, KE-54, And KE-38B Platforms
Project Description
Pertamina Hulu Energi West Madura Offshore (PHE WMO), as operator of West Madura Offshore Field, plans to develop this field further. Therefore, 3 well head platform will be built, named as KE39, KE38B and KE54. All of these platforms will be placed in an adjacent area, with their own location characteristic.
KE39, KE38B and KE54 is a braced monopod platform. All of them are an identical platform. It has 4 level deck, with two boat landing. These platform will be installed in the largest reservoir in West Madura Block. After its installed and operated, KE38B production reach the highest production number among all PHE WMO’s platform
Platform Description
üBraced Monopod Jacket Wellhead platform
üNumber of Deck = 4
Main Deck El. (+) 59’-6”
Mezzanine Deck El. (+) 46’-6”
Cellar Deck El. (+) 35’-6”
Sub Cellar Deck El. (+) 20’-0”
üPlatform Weight
Jacket Weight = 699.88 kips
Pile Weight = 554.04 kips
Deck Weight = 652.67 kips
Platform Description
12 x Well slots (6 well slot for initial production and 6 well slot for future development
üTopside Facility
Pedestal Crane
Diesel Generator set
Navigation Aid
Pig Launcher
Wellheads
WHCP Pneumatic – Hydraulic System
Chemical Injection Package
Instrument Utylity Gas System
Platform Description
üTopside Facility
AC / DC Distribution Board
RTU – SCADA
Radio Link / Antena
Close & Open Drain System
Horizontal Tes Separator Package (Three Pase Separator
Scope of Services
BiRU provides engineering service for the construction of 3 platform. This engineering phase will involve several discipline, such as Process, Process Safety, Piping, Mechanical, Electrical, Instrumentation and Structural. All analysis was performed simultaniously. Team structure also was challange to perform analysis with for each platform condition. Beside that, BiRU was requested to perform pre-service analysis such as upending and seafastening analysis.
During fabrication phase, BiRU’s responsibility is to provide field adjustment assessment and to produce as-built drawing. BiRU also provide procurement service during engineering ang fabrication phase.